Bearings Structural Solutions Repairs to Grosvenor Place SW1
Grosvenor Place SW1

After major impact damage was caused to the listed stone balustrade adjacent to the public footpath at the rear to Buckingham Palace. Bearings were instructed by Grosvenor Properties to repair the damaged sandstone bottles and copings along with localised concrete repairs. Due to the high profile location the stonework was profiled, manufacture and replaced within three weeks causing minimal disruption to this popular tourist location.